1. The supplier company provides equipment installation instructions (including assembly, piping, welding, power distribution, etc.) and technical training for users.
2. Installation and commissioning: The supplier will send the installer to the customer's factory to guide the installation and commissioning of the equipment. The customer is responsible for the accommodation and accommodation expenses of the installer and the local transportation fee.
3. Production Guidance: The supplier provides free production guidance to help the buyer to produce qualified products.
4. Purchasing service: The supplier can provide purchasing services for accessories, raw and auxiliary materials and other items.
5. Quality Assurance Period: The free warranty period is one year from the date of delivery of the contract equipment. After the equipment has passed the warranty period, the supplier still provides long-term technical support and after-sales service.
6. Service guarantee: The equipment responds within 2 hours, arrives at the scene within 24 hours, and eliminates the fault within 72 hours (except for force majeure).
User matching conditions
1. The user needs to prepare the following production conditions before the supplier company sends the installer:
2. 1. Equipment and production line equipment foundation;
3. 2. Forklift (capability ≥ 3T);
4. 3. Compress air and its pipelines, and the pipelines are connected to the relevant fuselage;
5. 4. Power (three-phase five-wire system, the power supply must be grounded), and the cable is connected to the main control cabinet of the equipment;
6. 5. Tools involved during installation and commissioning;
7. 6. The user shall install a temperature and humidity regulator at the automatic paper machine and the electrostatic generator to ensure constant air temperature and humidity;
8. 7. The equipment must be placed in a ventilated, dry environment to be transported to the user;
9. 8. User side staffing: no less than 2 people.
Total amount of the project
Payment method 30% as advance payment by T/T after signing contract; 70% paid by T/T after inspection in JINGZHI factory before delivery. Delivery time 40 working days since receiving advance payment( except Chinese national holiday)
Packing and transportation Standard export packing and the transportation is carried out by the buyer or the seller is
shipped on behalf of the seller
Quote validity period Within 15 days from the date of quote